-
Recent Posts
Categories
- Aquatic Connectivity- Benefitting Streams and Communities (4)
- Asian Carp (14)
- Chemicals Policy in the Great Lakes (1)
- climate-change-and-the-Great-Lakes (1)
- Conference Updates (24)
- Conservation Results for Public-Private Partnerships (3)
- Creating a Paradigm Shift…Putting the Buffalo River First!! (1)
- Emerging Contaminant Threats and the Great Lakes (4)
- Fiscal Accountablity (1)
- Getting Results: Implementing & Monitoring Habitat Restoration Projects (1)
- Gray and Green of CSO Control and Stormwater Management in Northeast Ohio (2)
- Great Lakes Congressional Watch (244)
- Congressional Winners and Losers (134)
- Governors (6)
- Mayors (4)
- US House (16)
- US Senate (24)
- White House (47)
- Great Lakes Days (3)
- Great Lakes Restoration Initiative (49)
- Great Waters (1)
- Green Returns on Blue Investments (2)
- In the News (43)
- Jobs & Economic Recovery (49)
- Keynote Speaker (2)
- Letters to the Hill (3)
- News & Events (38)
- Events (17)
- Great Lakes Conference (14)
- Great Lakes Day (2)
- Restoration Tour (1)
- Press Releases (18)
- Events (17)
- Opening Remarks (1)
- Plastics in the Great Lakes (1)
- Policy (156)
- Areas of Concern (43)
- Asian Carp Barrier Act (21)
- Clean Water Act (2)
- Farm Bill (2)
- Great Lakes Collaboration Implementation Act (21)
- Great Lakes Ecosystem Protection Act (6)
- Great Lakes Regional Collaboration (16)
- Great Lakes Restoration Initiative (17)
- National Aquatic Invasive Species Act (5)
- Water Conservation (2)
- Presidential Candidate Forum (1)
- Press Releases (75)
- Reconnecting Lake Erie to the River Raisin (1)
- Reducing Vulnerability of Restoration Projects to Climate Change (2)
- Reports (19)
- Success Stories (59)
- Success Stories (11)
- Take Action (27)
- Testimony (1)
- Threats (114)
- Aquatic Invasive Species (84)
- Asian Carp (33)
- Asian Carp (1)
- Habitat Destruction (4)
- Polluted Run-off (6)
- Sewage Contamination and Beach Closings (12)
- Toxic Pollution (11)
- Aquatic Invasive Species (84)
- Tools for Assessing Industrial Water Stewardship (1)
- Towards a Complete and Green Cleveland (1)
- Your Lake & You (9)
- Lake Erie (2)
- Lake Huron (2)
- Lake Michigan (3)
- Lake Superior (2)
- Your Stories & Photos (14)
Nature returns to an urban creek in Cleveland
| Project Summary Urban development in Cleveland left Big Creek, a tributary of the Cuyahoga River, a polluted mess that was prone to flooding. An ambitious restoration project returned the creek to a more natural state. The project reduced polluted runoff and created wetlands and other habitat that benefited fish, wildlife and people who live near the creek |
Project name: Big Creek Watershed Stormwater Management Improvement.
Location: Cleveland, Ohio.
Description: A group of government agencies and private engineering firms developed a plan to restore nearly one mile of Big Creek, which was disfigured by decades of urban development. Intense development increased the volume of polluted stormwater that flowed into the creek, the Cuyahoga River and Lake Erie. Human activities also straightened the creek, separated it from natural floodplains and destroyed wetlands. The restoration work removed large debris from the creek, stabilized eroding stream banks, replaced defective culverts, created wetlands, reconnected the creek to the floodplain and restored its natural meander. Crews also planted native vegetation along the restored stream banks.
Approximate cost of project: $923,758.
Resource challenges addressed: Soil erosion, non-point and point source pollution, excessive stormwater runoff, loss of wetlands and loss of fish and wildlife habitat.
Key partners (public and private): The cities of Parma and Cleveland, the Ohio Department of Transportation, and the Northeast Ohio Regional Sewer District and the city of Cleveland’s Division of Water Pollution Control. The engineering firms DLZ and Biohabitats designed the restoration project and managed construction activities. Biohabitats prepared stream channel restoration designs for 4,500 linear feet along the Chevrolet Branch of Big Creek.

The same section of the creek after the restoration work was completed. (Photo courtesy of Biohabitats)
Types of jobs created: Environmental engineers, hydrologists, ecologists, biologists, excavators, landscape architects and landscapers.
Results and accomplishments: The restoration work created wetlands and other habitat for fish and wildlife and restored a more natural flow in the creek. The work also curtailed flooding and reduced the volume of sediment and other pollutants that wash into the Cuyahoga River and Lake Erie following rain showers or periods of snow melt.
Web site: http://bit.ly/zNBDKU

